12th Quarter - Final Quarterly Progress Report

Table 1 - Project Tasks Completion to Date

(values updated Through April 15, 2002)

Schedule

A master schedule detailing all required environmental activities specified in the Order, along with project activities under contract, was included in the Quarter 2 Progress Report.  In addition, a schedule to track outstanding project activities and deliverables under each of the eight active delivery orders during Quarter 9 was previously submitted to CSSA for review and comment.

Project Tasks and Costs Incurred to Date

Work at CSSA is currently being conducted under ten projects.  The tasks included in each project and the percent complete are included in Table 1.  As required by item VI.5.h of the order, a statement reflecting the percentage of work accomplished thus far within the fiscal year, and the percentage of funds expended to date, will be reported in the progress report for Quarter 3 and every third progress report thereafter.  Therefore, a fiscal update is presented in Attachment 1 of this report and the next fiscal update will be presented in the Quarter 15 Progress Report.

Project Contacts

Contact information for key personnel involved with the CSSA projects are included in Table 2.

Other

Meeting minutes are included in the Environmental Encyclopedia, Volume 1-1 behind the Meetings tab.  A list of project meetings and available minutes conducted during Quarter 12 can be located in that Volume.

Table 1:  Project Tasks completion to Date

Project Number

Description of Task

Relation to Order

Percent Complete

DO23

Project Management

RFI

100%

 

Plan Addenda

RFI

100%

 

Meetings

RFI

100%

 

Sampling/Analysis

RFI

100%

 

Well Upgrades

RFI

100%

 

Well Installations

RFI

100%

 

Hazardous Waste Management

RFI

100%

RL17

RFI Scoping

RFI

100%

 

Site Characterization

RFI

65%

 

Treatability Investigations

RFI

95%

 

Sampling and Analysis

RFI

85%

 

Site Work and Utilities

RFI

100%

 

Meeting Minutes Preparation

RFI

100%

 

Presentation Materials

RFI

100%

 

Letter Report Preparation

RFI

100%

 

Project Management

RFI

87%

 

Integrated Waste Management/Spill Plan

NA

100%

 

Program Management

RFI

85%

RL33

Project Management

RFI

99%

 

Meetings

RFI

100%

 

Project Plans

RFI

100%

 

GIS

RFI

100%

 

Site Investigations and UXO Clearance

RFI

99%

 

B-20 Treatability Studies

RFI

100%

 

IDW Management

RFI

100%

 

Program Management

RFI

95%

RL53

Project Management

RFI

95%

 

Site Characterizations

RFI

90%

 

Groundwater Wells

RFI

100%

 

Sampling and Analysis

RFI

90%

 

GIS

RFI

98%

 

Project Plans

RFI

100%

 

Meetings

RFI

100%

 

Background Evaluation

RFI

100%

 

Program Management

RFI

93%

RL74

Project Management

IM/RFI

97%

 

Meetings

IM/RFI

100%

 

Groundwater Monitoring

IM

99%

 

Pump Installation

RFI

15%

 

SVE Operations & Maintenance

RFI

100%

 

Plans

RFI

100%

 

Current Conditions Report

RFI

100%

 

O-1 Interim Measures

IM

99%

 

H Order Support

IM/RFI

65%

 

Building 40 Sampling

RFI

93%

 

GIS and Web Site

IM/RFI

94%

 

IDW Management

RFI

100%

 

Groundwater Modeling

RFI

5%

 

Encyclopedia Updates

RFI

100%

 

Laboratory Audit

IM/RFI

100%

 

Off-post Well Sampling

IM

100%

 

Additional Rounds of Groundwater Monitoring

IM/RFI

100%

 

Program Management

RFI

98%

RL83

Project Management

IM/RFI

98%

 

Meetings

IM/RFI

75%

 

Well Research and Mapping

RFI

100%

 

Hydrogeologic Conceptual Model

RFI

80%

 

B-3 SVE Operations & Maintenance

RFI

75%

 

Risk Assessment Conceptual Site Model

RFI

80%

 

Cluster Well Installations

RFI

95%

 

Quarterly Progress Reports

IM/RFI

100%

 

SWMU and AOC Investigations

RFI

95%

 

Soil Pile Disposition Assessment

IM

80%

 

Encyclopedia Updates

IM/RFI

85%

 

Title V Non-applicability Demonstration

NA

95%

 

SPCC Plan Update

NA

100%

 

TPDES Permit Update

NA

100%

 

Laboratory Audit

IM/RFI

80%

 

GIS Enhancements and Database Updates

IM/RFI

90%

 

Groundwater Monitoring

IM/RFI

40%

 

Community Relations Plan

RFI

100%

 

Program Management

IM/RFI

75%

DO5068

DO Management and Meetings

IM/RFI

89%

 

Geophysics and Drilling

RFI

100%

 

Surface Sampling

RFI

100%

 

Soil Gas Surveys

RFI

100%

 

AOC 50 Interim Measures

IM/RFI

100%

 

Work Plans and Reporting

RFI

75%

DO5084

DO Management and Meetings

IM/RFI

57%

 

AOC-65 Phase II RFI

RFI

95%

 

Soil Gas Surveys

RFI

100%

 

AOC-67 Phase II RFI

RFI

98%

 

On-post Groundwater Monitoring

IM/RFI

93%

 

Off-post Groundwater Monitoring

IM/RFI

65%

 

PIMS Study

IM

100%

 

LAN Support

NA

68%

 

Drought Contingency Plan

NA

69%

 

Community Relations Plan Updates

RFI

80%

 

Lab Audit

IM/RFI

20%

 

Aerial Photography

NA

50%

 

Quarterly Reports

IM/RFI

50%

TO 0042

Task Order Management

IM/RFI

27%

 

Meetings

IM/RFI

20%

 

Site Survey/Workplans

IM/RFI

99%

 

New well installation/Well Upgrade

RFI

5%

 

Groundwater Monitoring

RFI

17%

 

Analytical Validation

RFI

20%

 

Information Management Systems

RFI

5%

TO 0058

Task Order Management

IM/RFI/TS

50%

 

Meetings

IM/RFI/TS

25%

 

Building 90 Removal Action

IM/HEA

20%

 

Treatability Study

RFI/TS

35%

 

Treatability Study Report and Technology Evaluation

RFI/TS

0%

* Reduced due to extension of project (if applicable).