1st Quarter, May 1 - July 30, 1999

Final Quarterly Progress Report, August 1999

Table of Contents

This quarterly progress report for Camp Stanley Storage Activity (CSSA), Texas, U.S. Environmental Protection Agency (EPA) Identification Number TX2210020739, is submitted in accordance with the Administrative Order on Consent (Order) issued to CSSA on May 5, 1999 pursuant to §3008(h) of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA), and further amended by the Hazardous and Solid Waste Amendments of 1984, 42 United States Code (U.S.C.) §6928(h). This report is the first progress report for the project, and it includes progress on the project from May 1, 1999 through July 30, 1999. Subsequent progress reports will be submitted on a quarterly basis.

This report details work completed on tasks associated with four project phases outlined in the order. Phase names and task names listed below are taken directly from the Order. For each active task, the information requested in the Order is provided in this report. If the task is not yet active, that is also noted.

Interim Measures

Task I - Interim/Stabilization Measures Work Plan

Task II - Interim/Stabilization Measures Implementation

Task III - Reports

RCRA Facility Investigation

Task I - Preliminary Report: Description of Current Conditions

Task II - RFI Workplan

Task III - Facility Investigation

Task IV - Human Health and Ecological Risk Assessment

Task V - Investigation Analysis

Task VI - Treatability Studies

Task VII - Progress Reports

Corrective Measures Study

Task VIII - Identification and development of Corrective Action Alternatives

Task IX - Evaluation of Corrective Measures Alternatives

Task X - Reports

Corrective Measures Implementation

Task XI - Corrective Measure Implementation Program

Task XII - Corrective Measure Design

Task XIII - Corrective Measure Construction

Task XIV - Reports

Also included in this progress report is a discussion of the overall schedule for CSSA’s environmental program and costs incurred to date. The progress report for Quarter 2 will include a comprehensive GANTT chart showing the schedule for all of the planned environmental activities, as well as a site- and activity-specific analysis of costs incurred to date.

In addition, since this is the first quarterly progress report delivered in accordance with the Order, a project team chart is included. In addition, telephone numbers and addresses of all members of the project team is also included.

Order work tasks fall under four basic categories: Interim Measures, RCRA Facility Investigation, Corrective Measures Study, and Corrective Measures Implementation. To meet the requirements of the Order, it is estimated that the majority of the work efforts will be part of the RCRA Facility Investigation and the Corrective Measures Implementation. The relative proportion of each of the project in relation to the overall work effort is shown in the piechart below.

Schedule

A master schedule detailing all of the required environmental activities specified in the Order, along with project activities under contract, is currently being prepared, and will be included in the next quarter’s progress report.

Specific activities planned for the next quarter were described in the preceding sections. Highlights of next quarter’s planned activities are listed below:

Action

Date

Submit Interim Measures Workplan

September 1, 1999

Submit RFI Workplan

September 1, 1999

Submit Community Relations Plan

September 1, 1999

Commence groundwater sampling

August 3, 1999 (tentative)

Commence IM at SWMU O-1

Upon EPA approval of IM Workplan

Commence RFIs at SWMUs and AOCs

Upon EPA approval of RFI Workplan

Project Tasks and Costs Incurred to Date

Work at CSSA is currently being conducted under six projects. The tasks included in each project and the percent complete are included in the table below. The next quarterly progress report will also include a table which details costs incurred to date on all of CSSA’s environmental activities.

Project Number

Description of Task

Relation to Order

Percent Complete

DO23

Project Management

RFI

138%

Plan Addenda

RFI

100%

Meetings

RFI

70%

Sampling/Analysis

RFI

54%

Well Upgrades

RFI

94%

Well Installations

RFI

5%

Hazardous Waste Management

RFI

75%

RL17

RFI Scoping

RFI

100%

Site Characterization

RFI

60%

Treatability Investigations

RFI

95%

Sampling and Analysis

RFI

90%

Site Work and Utilities

RFI

100%

Meeting Minutes Preparation

RFI

90%

Presentation Materials

RFI

95%

Letter Report Preparation

RFI

100%

Project Management

RFI

100%

Integrated Waste Management/Spill Plan

NA

100%

Program Management

RFI

100%

RL33

Project Management

RFI

75%

Meetings

RFI

60%

Project Plans

RFI

100%

GIS

RFI

100%

Site Investigations and UXO Clearance

RFI

75%

B-20 Treatability Studies

RFI

40%

IDW Management

RFI

0%

Program Management

RFI

75%

RL53

Project Management

RFI

75%

Site Characterizations

RFI

10%

Groundwater Wells

RFI

0%

Sampling and Analysis

RFI

0%

GIS

RFI

95%

Project Plans

RFI

100%

Meetings

RFI

50%

Background Evaluation

RFI

0%

Program Management

RFI

75%

RL74

Project Management

IM/RFI

40%

Meetings

IM/RFI

33%

Groundwater Monitoring

IM

3%

Pump Installation

RFI

0%

SVE Operations & Maintenance

RFI

2%

Plans

RFI

100%

Current Conditions Report

RFI

100%

O-1 Interim Measures

IM

2%

H Order Support

IM/RFI

15%

Building 40 Sampling

RFI

0%

GIS and Web Site

IM/RFI

30%

IDW Management

RFI

0%

Groundwater Modeling

RFI

0%

Encyclopedia Updates

RFI

20%

Laboratory Audit

IM/RFI

75%

Offsite Well Sampling

IM

0%

Additional Rounds of Groundwater Monitoring

IM/RFI

0%

RL83

Project Management

IM/RFI

3%

Meetings

IM/RFI

10%

Well Research and Mapping

RFI

1%

Hydrogeologic Conceptual Model

RFI

0%

B-3 SVE Operations & Maintenance

RFI

0%

Risk Assessment Conceptual Site Model

RFI

0%

Cluster Well Installations

RFI

1%

Quarterly Progress Reports

IM/RFI

12.5%

SWMU and AOC Investigations

RFI

10%

Soil Pile Disposition Assessment

IM

1%

Encyclopedia Updates

IM/RFI

0%

Title V Non-applicability Demonstration

NA

0%

SPCC Plan Update

NA

0%

TPDES Permit Update

NA

0%

Laboratory Audit

IM/RFI

0%

GIS Enhancements and Database Updates

IM/RFI

0%

Groundwater Monitoring

IM/RFI

0%

Community Relations Plan

RFI

10%

Project Team

The project team consists of personnel from U.S. EPA, TNRCC, CSSA, AFCEE, WPI (support to AFCEE), Parsons ES, and subcontractors. A project team organization chart is included in the following figure. Contact information is provided in the following table.

Name

Organization

Street Address

City, State, Zip

Phone No.

Fax No.

Beal, Christopher

WPI

c/o Brian Murphy, 25800 Ralph Fair Road

Boerne, TX 78015

(210) 698-5208

(210) 295-7386

Brown, Ed

AFCEE/ERC

3207 North Road

Brooks AFB, TX 78235

(210) 536-5665

(210) 536-9026

Burdey, Julie

Parsons ES

8000 Centre Park Dr., Suite 200

Austin, TX 78754

(512) 719-6062

(512) 719-6099

Coulter, Kirk

TNRCC

P.O. Box 13087

Austin, TX 78711-3087

(512) 239-2572

(512) 239-2346

Decker, Jon

Parsons ES

400 Woods Mill Rd. South, #330

Chesterfield, MO 63017

(314) 576-7330

(314) 576-0852

Gordon, Shavonne

Parsons ES

8000 Centre Park Dr., Suite 200

Austin, TX 78754

(512) 719-6011

(512) 719-6099

Hailer, Joseph

WPI

100 NE Loop 410

San Antonio, TX 78216

(210) 525-8485

(210) 525-1801

Hefner, Rene

AFCEE/ERC

3207 North Road

Brooks AFB, TX 78235

(210) 536-4763

(210) 536-9026

Highland, David

Parsons ES

8000 Centre Park Dr., Suite 200

Austin, TX 78754

(512) 719-6060

(512) 719-6099

Hinchee, Robert

Parsons ES

406 E S. Jordan Pkwy, Suite 300

Salt Lake City, UT 84095

(801) 572-5999

(801) 572-9069

Jones, Greg

Parsons ES

5390 Triangle Parkway

Norcross, GA 30092

(770) 446-4900

(770) 446-4910

Lyssy, Greg

U.S. EPA

1445 Ross Avenue

Dallas, TX 75202

(214) 665-8317

(214) 665-6660

Mirchandani, Karuna

Parsons ES

8000 Centre Park Dr., Suite 200

Austin, TX 78754

(512) 719-6054

(512) 719-6099

Mullen, Jo Jean

AFCEE/ERD

3207 North Road

Brooks AFB, TX 78235

(210) 536-5940

(210) 536-9026

Murphy, Brian

CSSA

25800 Ralph Fair Road

Boerne, TX 78015

(210) 698-5208
(210) 861-5217

(210) 295-7386

Pearson, Scott

Parsons ES

8000 Centre Park Dr., Suite 200

Austin, TX 78754

(512) 719-6087

(512) 719-6099

Rembish, Steve

Parsons ES

8000 Centre Park Dr., Suite 200

Austin, TX 78754

(512) 719-6067

(512) 719-6099

Roberts, Susan

Parsons ES

8000 Centre Park Dr., Suite 200

Austin, TX 78754

(512) 719-6051

(512) 719-6099

Rossello, Steve

Parsons ES

290 Elwood Davis Rd, Suite 312

Liverpool, NY 13088

(315) 451-9560

(315) 451-9570

Rice, Ken

Parsons ES

8000 Centre Park Dr., Suite 200

Austin, TX 78754

(512) 719-6050

(512) 719-6099

Schrader, Steve

Parsons ES

8000 Centre Park Dr., Suite 200

Austin, TX 78754

(512) 719-6048

(512) 719-6099

St. Clair, Tony

Parsons ES

8000 Centre Park Dr., Suite 200

Austin, TX 78754

(512) 719-6821

(512) 719-6099

Stine, Nancy

AMC CONF/LGCFB

507 Symington Dr, Rm W202

Scott AFB, IL 62225

   

Vail, Christina

Parsons ES

901 NE Loop 410, Suite 512

San Antonio, TX 78209

(210) 828-4900

(210) 828-9440

Vanderglas, Brian

Parsons ES

8000 Centre Park Dr., Suite 200

Austin, TX 78754

(512) 719-6059

(512) 719-6099