This quarterly progress report for Camp Stanley Storage Activity (CSSA), Texas, U.S. Environmental Protection Agency (EPA) Identification Number TX2210020739, is submitted in accordance with the Administrative Order on Consent (Order) issued to CSSA on May 5, 1999 pursuant to §3008(h) of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA), and further amended by the Hazardous and Solid Waste Amendments of 1984, 42 United States Code (U.S.C.) §6928(h). This report is the first progress report for the project, and it includes progress on the project from May 1, 1999 through July 30, 1999. Subsequent progress reports will be submitted on a quarterly basis.
This report details work completed on tasks associated with four project phases outlined in the order. Phase names and task names listed below are taken directly from the Order. For each active task, the information requested in the Order is provided in this report. If the task is not yet active, that is also noted.
Task I - Interim/Stabilization Measures Work Plan
Task II - Interim/Stabilization Measures Implementation
Task I - Preliminary Report: Description of Current Conditions
Task III - Facility Investigation
Task IV - Human Health and Ecological Risk Assessment
Task V - Investigation Analysis
Task VI - Treatability Studies
Task VIII - Identification and development of Corrective Action Alternatives
Task IX - Evaluation of Corrective Measures Alternatives
Corrective Measures Implementation
Task XI - Corrective Measure Implementation Program
Task XII - Corrective Measure Design
Task XIII - Corrective Measure Construction
Also included in this progress report is a discussion of the overall schedule for CSSA’s environmental program and costs incurred to date. The progress report for Quarter 2 will include a comprehensive GANTT chart showing the schedule for all of the planned environmental activities, as well as a site- and activity-specific analysis of costs incurred to date.
In addition, since this is the first quarterly progress report delivered in accordance with the Order, a project team chart is included. In addition, telephone numbers and addresses of all members of the project team is also included.
Order work tasks fall under four basic categories: Interim Measures, RCRA Facility Investigation, Corrective Measures Study, and Corrective Measures Implementation. To meet the requirements of the Order, it is estimated that the majority of the work efforts will be part of the RCRA Facility Investigation and the Corrective Measures Implementation. The relative proportion of each of the project in relation to the overall work effort is shown in the piechart below.
Schedule
A master schedule detailing all of the required environmental activities specified in the Order, along with project activities under contract, is currently being prepared, and will be included in the next quarter’s progress report.
Specific activities planned for the next quarter were described in the preceding sections. Highlights of next quarter’s planned activities are listed below:
Action |
Date |
Submit Interim Measures Workplan |
September 1, 1999 |
Submit RFI Workplan |
September 1, 1999 |
Submit Community Relations Plan |
September 1, 1999 |
Commence groundwater sampling |
August 3, 1999 (tentative) |
Commence IM at SWMU O-1 |
Upon EPA approval of IM Workplan |
Commence RFIs at SWMUs and AOCs |
Upon EPA approval of RFI Workplan |
Project Tasks and Costs Incurred to Date
Work at CSSA is currently being conducted under six projects. The tasks included in each project and the percent complete are included in the table below. The next quarterly progress report will also include a table which details costs incurred to date on all of CSSA’s environmental activities.
Project Number |
Description of Task |
Relation to Order |
Percent Complete |
DO23 |
Project Management |
RFI |
138% |
Plan Addenda |
RFI |
100% |
|
Meetings |
RFI |
70% |
|
Sampling/Analysis |
RFI |
54% |
|
Well Upgrades |
RFI |
94% |
|
Well Installations |
RFI |
5% |
|
Hazardous Waste Management |
RFI |
75% |
|
RL17 |
RFI Scoping |
RFI |
100% |
Site Characterization |
RFI |
60% |
|
Treatability Investigations |
RFI |
95% |
|
Sampling and Analysis |
RFI |
90% |
|
Site Work and Utilities |
RFI |
100% |
|
Meeting Minutes Preparation |
RFI |
90% |
|
Presentation Materials |
RFI |
95% |
|
Letter Report Preparation |
RFI |
100% |
|
Project Management |
RFI |
100% |
|
Integrated Waste Management/Spill Plan |
NA |
100% |
|
Program Management |
RFI |
100% |
|
RL33 |
Project Management |
RFI |
75% |
Meetings |
RFI |
60% |
|
Project Plans |
RFI |
100% |
|
GIS |
RFI |
100% |
|
Site Investigations and UXO Clearance |
RFI |
75% |
|
B-20 Treatability Studies |
RFI |
40% |
|
IDW Management |
RFI |
0% |
|
Program Management |
RFI |
75% |
|
RL53 |
Project Management |
RFI |
75% |
Site Characterizations |
RFI |
10% |
|
Groundwater Wells |
RFI |
0% |
|
Sampling and Analysis |
RFI |
0% |
|
GIS |
RFI |
95% |
|
Project Plans |
RFI |
100% |
|
Meetings |
RFI |
50% |
|
Background Evaluation |
RFI |
0% |
|
Program Management |
RFI |
75% |
|
RL74 |
Project Management |
IM/RFI |
40% |
Meetings |
IM/RFI |
33% |
|
Groundwater Monitoring |
IM |
3% |
|
Pump Installation |
RFI |
0% |
|
SVE Operations & Maintenance |
RFI |
2% |
|
Plans |
RFI |
100% |
|
Current Conditions Report |
RFI |
100% |
|
O-1 Interim Measures |
IM |
2% |
|
H Order Support |
IM/RFI |
15% |
|
Building 40 Sampling |
RFI |
0% |
|
GIS and Web Site |
IM/RFI |
30% |
|
IDW Management |
RFI |
0% |
|
Groundwater Modeling |
RFI |
0% |
|
Encyclopedia Updates |
RFI |
20% |
|
Laboratory Audit |
IM/RFI |
75% |
|
Offsite Well Sampling |
IM |
0% |
|
Additional Rounds of Groundwater Monitoring |
IM/RFI |
0% |
RL83 |
Project Management |
IM/RFI |
3% |
Meetings |
IM/RFI |
10% |
|
Well Research and Mapping |
RFI |
1% |
|
Hydrogeologic Conceptual Model |
RFI |
0% |
|
B-3 SVE Operations & Maintenance |
RFI |
0% |
|
Risk Assessment Conceptual Site Model |
RFI |
0% |
|
Cluster Well Installations |
RFI |
1% |
|
Quarterly Progress Reports |
IM/RFI |
12.5% |
|
SWMU and AOC Investigations |
RFI |
10% |
|
Soil Pile Disposition Assessment |
IM |
1% |
|
Encyclopedia Updates |
IM/RFI |
0% |
|
Title V Non-applicability Demonstration |
NA |
0% |
|
SPCC Plan Update |
NA |
0% |
|
TPDES Permit Update |
NA |
0% |
|
Laboratory Audit |
IM/RFI |
0% |
|
GIS Enhancements and Database Updates |
IM/RFI |
0% |
|
Groundwater Monitoring |
IM/RFI |
0% |
|
Community Relations Plan |
RFI |
10% |
Project Team
The project team consists of personnel from U.S. EPA, TNRCC, CSSA, AFCEE, WPI (support to AFCEE), Parsons ES, and subcontractors. A project team organization chart is included in the following figure. Contact information is provided in the following table.
Name |
Organization |
Street Address |
City, State, Zip |
Phone No. |
Fax No. |
Beal, Christopher |
WPI |
c/o Brian Murphy, 25800 Ralph Fair Road |
Boerne, TX 78015 |
(210) 698-5208 |
(210) 295-7386 |
Brown, Ed |
AFCEE/ERC |
3207 North Road |
Brooks AFB, TX 78235 |
(210) 536-5665 |
(210) 536-9026 |
Burdey, Julie |
Parsons ES |
8000 Centre Park Dr., Suite 200 |
Austin, TX 78754 |
(512) 719-6062 |
(512) 719-6099 |
Coulter, Kirk |
TNRCC |
P.O. Box 13087 |
Austin, TX 78711-3087 |
(512) 239-2572 |
(512) 239-2346 |
Decker, Jon |
Parsons ES |
400 Woods Mill Rd. South, #330 |
Chesterfield, MO 63017 |
(314) 576-7330 |
(314) 576-0852 |
Gordon, Shavonne |
Parsons ES |
8000 Centre Park Dr., Suite 200 |
Austin, TX 78754 |
(512) 719-6011 |
(512) 719-6099 |
Hailer, Joseph |
WPI |
100 NE Loop 410 |
San Antonio, TX 78216 |
(210) 525-8485 |
(210) 525-1801 |
Hefner, Rene |
AFCEE/ERC |
3207 North Road |
Brooks AFB, TX 78235 |
(210) 536-4763 |
(210) 536-9026 |
Highland, David |
Parsons ES |
8000 Centre Park Dr., Suite 200 |
Austin, TX 78754 |
(512) 719-6060 |
(512) 719-6099 |
Hinchee, Robert |
Parsons ES |
406 E S. Jordan Pkwy, Suite 300 |
Salt Lake City, UT 84095 |
(801) 572-5999 |
(801) 572-9069 |
Jones, Greg |
Parsons ES |
5390 Triangle Parkway |
Norcross, GA 30092 |
(770) 446-4900 |
(770) 446-4910 |
Lyssy, Greg |
U.S. EPA |
1445 Ross Avenue |
Dallas, TX 75202 |
(214) 665-8317 |
(214) 665-6660 |
Mirchandani, Karuna |
Parsons ES |
8000 Centre Park Dr., Suite 200 |
Austin, TX 78754 |
(512) 719-6054 |
(512) 719-6099 |
Mullen, Jo Jean |
AFCEE/ERD |
3207 North Road |
Brooks AFB, TX 78235 |
(210) 536-5940 |
(210) 536-9026 |
Murphy, Brian |
CSSA |
25800 Ralph Fair Road |
Boerne, TX 78015 |
(210) 698-5208 |
(210) 295-7386 |
Pearson, Scott |
Parsons ES |
8000 Centre Park Dr., Suite 200 |
Austin, TX 78754 |
(512) 719-6087 |
(512) 719-6099 |
Rembish, Steve |
Parsons ES |
8000 Centre Park Dr., Suite 200 |
Austin, TX 78754 |
(512) 719-6067 |
(512) 719-6099 |
Roberts, Susan |
Parsons ES |
8000 Centre Park Dr., Suite 200 |
Austin, TX 78754 |
(512) 719-6051 |
(512) 719-6099 |
Rossello, Steve |
Parsons ES |
290 Elwood Davis Rd, Suite 312 |
Liverpool, NY 13088 |
(315) 451-9560 |
(315) 451-9570 |
Rice, Ken |
Parsons ES |
8000 Centre Park Dr., Suite 200 |
Austin, TX 78754 |
(512) 719-6050 |
(512) 719-6099 |
Schrader, Steve |
Parsons ES |
8000 Centre Park Dr., Suite 200 |
Austin, TX 78754 |
(512) 719-6048 |
(512) 719-6099 |
St. Clair, Tony |
Parsons ES |
8000 Centre Park Dr., Suite 200 |
Austin, TX 78754 |
(512) 719-6821 |
(512) 719-6099 |
Stine, Nancy |
AMC CONF/LGCFB |
507 Symington Dr, Rm W202 |
Scott AFB, IL 62225 |
||
Vail, Christina |
Parsons ES |
901 NE Loop 410, Suite 512 |
San Antonio, TX 78209 |
(210) 828-4900 |
(210) 828-9440 |
Vanderglas, Brian |
Parsons ES |
8000 Centre Park Dr., Suite 200 |
Austin, TX 78754 |
(512) 719-6059 |
(512) 719-6099 |