Table 5 - Asbestos Materials at CSSA
Building No. |
ACM Found |
Condition |
Recommendation |
89 |
60 lf* |
Poor |
Remove ACM |
Supply lines B89 to W91 |
350 lf, 4-inch pipe |
Fair |
Could be done later at higher prices** |
350 lf, 2-inch pipe |
Fair |
||
12 lf, 1 elbow |
Fair |
||
A 100 under floor |
ACM ground into dirt under floor |
Poor |
Clean up and seal with a soil sealant |
A 100 inside |
682 lf above ceiling |
Fair |
CSSA decision |
37 |
60 lf air cell ACM |
Poor |
** |
38 |
Transite walls |
Good |
Remove only if building is demolished or remodeled |
46 |
50 lf |
Bad |
Remove** |
47 |
None found |
|
|
27 |
Floor in mechanical room |
Bad |
Clean up with HEPA vacuum** |
201 |
Transite panels |
Good |
CSSA decision; possible risk to maintenance personnel |
Boiler breeching |
Good |
** |
|
8 lf pipes |
Good |
** |
|
Quarters 11 |
No visible ACM; Sample taken of garage wall |
|
|
Quarters 21 |
25 lf |
Fair |
Possible risk to occupants** |
Quarters 22 |
25 lf |
Fair |
** |
Quarters 23 |
25 lf |
Fair |
** |