>
[Home] [Master Table of Contents]
Final Solid Waste Management Unit Demolition Dud Area Closure Report - January 2005
Table of Contents
1.2 Background and Site Description
1.2.1 Background and Site Description
1.3 Site Environmental Setting
Section 2 - Closure Activities
2.2.1 Confirmation Sampling Methodology
Section 3 - Conclusions and Closure Certification
3.2 Evaluation of Data Quality Objectives Attainment
Appendices
Appendix B – Statistical Analyses
Appendix C – Evaluation of Data Quality Objectives Attainment
Appendix D – Analytical Results Summary
Appendix E – Data Verification Reports
Figures
Figure DD-1 DD Site Location Map
Figure DD-2 Soils and Topographic Map
Figure DD-4 Sample Location Map
Figure DD-5 SWMU DD Area Site Location Map
Figure DD-6 SWMU DD Area Geologic Setting
Figure DD-7 SWMU DD Area Closure Sample Location Map
Tables
Table DD-1 SWMU DD Area RFI Report
Table DD-2 SWMU DD Area RFI Report
Table DD-3 Closure Confirmation Sampling Results, Dec 2003 - May 2004