Solid Waste Management Unit B-29, February 2005

Chronology of Actions/Investigations

Year

Month

Action/Results

Action Performed By

Project Number

Unknown

Unknown

Old quarry area was used for disposal of miscellaneous solid waste, munitions, and construction debris.

CSSA

NA

1993

September

A decayed drum of nickel penetrate was observed during the field survey.

Parsons ES

Order 71

1996

February

Work Plan for B-29 investigation submitted.

Parsons ES

RL17

March - April

EM geophysical survey performed on March 12 and April 2. Three geophysical anomalies found, all caused by waste management activities.

Parsons ES

RL17

March - April

Collected 3 surface soil samples (SS1-SS3) on March 13, analyzed for VOCs, SVOCs, explosives and metals. Analytical results are currently in question due to ITS Laboratory practices.

Parsons ES

ITS

RL17

August

Completed 6 soil borings (SB1-SB6) on August 28, 29 and 30, and sampled for VOCs, SVOCs explosives, and metals. Analytical results are currently in question due to ITS Laboratory practices.

Parsons ES

CoreTerra

ITS

RL17

1997

May

Resampled SB1 on May 15 for VOCs only. Analytical results are currently in question due to ITS Laboratory practices.

Parsons ES

CoreTerra

ITS

RL17

1999

April

EPA memorandum indicated analytical results obtained from ITS are not usable.

EPA

NA

November

Submitted work plan for resampling to replace analytical chemistry data generated by ITS Laboratory.

Parsons ES

NA

2000

March

Collected 3 surface soil samples (SS1-3) for Rework, analyzed for VOCs, SVOCs, metals and explosives.

Advanced 6 soil borings (SB1-6) for Rework and collected 14 soil/rock samples for VOCs, SVOCs, metals and explosives (7 samples) and explosives (7 samples) and SVOCs, copper, zinc, lead and explosives (7 samples) analysis.

Parsons ES

APPL, Inc.

O’Brien & Gere

Data Chem

Rework

2002

August

Final RCRA Facility Investigation Report submitted.

Parsons

RL17

2003

December

Final TO 0019 Work Plan Addendum submitted.

Parsons

TO19

2004

January

Began slit trenching the side walls of the quarry.  Found burned debris mixed in with metal and small caliber projectiles.  Encountered seven 75 mm projectiles and frag bomb sleeves, work stopped until EOD personnel can be on site.

Soils excavated with EOD personnel on site to inspect any items of concern found.  Items found were banding material, ammo cans, one 55 gal. drum filled with 50 cal. casings, top component to grenades, railroad ties, and  20 mm casings.  Nothing was fused or contained a propellant.  No UXO items of concern found.

Waste characterization and closure samples collected.

Parsons

TO19

April - June

Excavated soil hauled off-post to Covel Gardens.  Hazardous soil piles mixed with phosphate.

Confirmation samples collected.

Parsons

TO19

2005

April

Final SWMU B-29 RCRA Facility Investigation Closure Report submitted.

Parsons

TO19

2008

February

Closure approved by TCEQ.

TCEQ

NA