SWMU B-25 View Facing North, January 1999

Site Status: Closed (July 2005)

Background

bullet

Description in Current Conditions Report (July 1999)

bullet

Chronology

bullet

Aerial Photograph

bullet

Figure B25-1 Plan View Map

Plans (Volume 1-2)

bullet

RL17 RFI Work Plan (February 1996)

bullet

RL17 Work Plan Amendment for Data Quality Rework (May 2000)

bullet

TO0019 Work Plan (December 2003)

Investigation Reports (Volume 3-1)

bullet

RCRA Facility Investigation Report

bullet

RCRA Facility Investigation Closure Report

Tables

bullet

Table B25-1  Summary of Chemical Constituents Detected in Surface Soil (March 2000) 

bullet

Table B25-2  Summary of Chemical Constituents Detected in Subsurface Soil (March 2000) 

Figures

bullet

Geophysical Anomaly Map

bullet

Figure B25-1  Site Location Map

bullet

Figure B25-2  Soils and Topographic Map

bullet

Figure B25-3  Geologic Setting

bullet

Figure B25-4  Sample Location Map

bullet

Figure B25-5  In-Phase Electromagnetic Data Map

bullet

Figure B25-6 Quadrature Phase Electromagnetic Data Map

Boring Logs

bullet

B25-SB1 (September 1996/March 2000)

bullet

B25-SB2 (September 1996/March 2000)

bullet

B25-SB3 (September 1996/March 2000)