Site Status: Closed (July 2005)

Background

bullet

Description in Current Conditions Report (July 1999)

bullet

Chronology

bullet

Aerial Photograph

Plans (Volume 1-2)

bullet

RL17 RFI Work Plan (February 1996)

bullet

RL83 RFI Work Plan (May 2000)

bullet

Figure B23-1 Proposed Soil Boring Locations

bullet

TO0019 Work Plan (December 2003)

Investigation Reports (Volume 3-1)

bullet

List of Relevant Previous Investigation Reports

bullet

Section 8 of the Technical Memorandum on Geophysical Surveys (October 1995)

bullet

RCRA Facility Investigation Report (June 2002)

bullet

RCRA Facility Investigation/Closure Report (April 2005)

Tables

bullet

Table B23-1  Summary of Chemical Constituents Detected in Soil Gas, August 1996

bullet

Table B23-2  Summary of Chemical Constituents Detected in Soil, March 2000

Figures

bullet

Geophysical Anomaly Map

bullet

Figure B23-1  Sample Location Map

bullet

Figure B23-2  Soils and Topographic Map

bullet

Figure B23-3  Geologic Setting

bullet

Figure B23-4  Sample Location Map