[Home]  [Master Table of Contents]

[Volume 1-6 Table of Contents]

Final Standard Operating Procedures

For Electronic Data Management

Table of Contents

1.0  Objective

2.0  Background

3.0  Responsibility

4.0  Required Equipment

5.0  Procedures

    5.1  Master Data List

    5.1  Electronic Field Logbook

    5.2  GPS Unit Data Dictionary

    5.2  Photographs

    5.3  Well Installation Electronic Data

    5.4  Groundwater Monitoring Program

    5.5  Geophysical

    5.6  Dataloggers

    5.7  Fieldwork Laptop Computer

    5.8  chERP

    5.9  Chain of Custodies

Attachment 1 Directory Structure on CSSA Server

Attachment 2 Valid Delivery Order/Task Order Designations RL17, RL33, RL53, RL74, RL83, DO23, DO5068, DO5084, TO08, TO09, TO12, TO42, TO58, TO79

Attachment 2 Valid On-post Groundwater Sample Identifications

Attachment 2 Valid Off-post Groundwater Sample Identifications