Health and Safety Plan - TO 0009 AOC 55 Remedial Action, June 2003

Table of Contents

 

Name

Date

Approved By Project Manager:

Ken Rice

June 17, 2003

This addendum provides additional information to the Health and Safety Plan for the Closure of Solid Waste Management Units at Camp Stanley Storage Activity (Volume 1-5 of the Environmental Encyclopedia).1 The purpose of this addendum is to describe safe practices for work to be performed during the AOC 55 Remedial Actions under task order 0009. An additional comprehensive safety plan will be generated to incorporate construction and UXO avoidance activities for all on-site personnel, including Parsons Personnel, subcontractors and CSSA workers.

Emergency Contacts

Section 1 - Introduction

1.1   Purpose and Policy

1.2   Site History and Description

1.3   Scope of Work

1.4   Project Team Organization

Section 2 - Safety and Health Risk Analysis

2.1   Chemical Hazards

2.1.1   Ordnance Material

2.2   Physical Hazards

2.2.1   Heat Stress

2.2.2   Cold Exposure

2.2.3   Snake and Africanized Bee Hazards

2.2.4   Poison Ivy

2.2.5   Noise

2.2.6   Chiggers and Ticks Hazards

2.2.7   Construction Hazards

2.2.8   Utilities and Electrical Hazards

2.2.8.1   Utilities

2.2.8.2   Overhead Utilities

2.3   Hazard Evaluation

2.3.1   Geophysical Survey

2.3.2   Ordnance

2.3.3   Surface Soil Sampling

2.3.4   Mapping

Section 3 - Personnel Protection and Monitoring

3.1   General Safety Training Requirements

3.2   Medical Surveillance

3.3   Site-Specific Training

3.4   Personal Protective Equipment and Action Levels

3.4.1   Level D Operations

3.4.2   Level C Operations

3.4.3   PPE and Equipment Decontamination Procedures

3.4.3.1   Decontamination Equipment

3.4.4   Equipment Needs

3.4.5   Monitoring Requirements

3.5   Low and Medium Priority SWMU

3.5.1   Geophysical Survey

3.5.2   Drilling/Well Installation

3.6   High Priority SWMU

3.6.1   Geophysical Survey

3.6.2   Soil Gas Survey

Section 4 - Site Control Measures, Accident Prevention, and Contingency Plan

4.1   Site Control Measures

4.2   Site Organization-Operation Zone

4.2.1   Exclusion Zone

4.2.2   Support Zone

4.3   Site Security

4.4   Site Communication

4.5   Safe Work Practices

4.6   Accident Prevention

4.7   Contingency Plan

4.7.1   Emergency Procedures

4.7.2   Chemical Exposure

4.7.3   Personal Injury

4.7.4   Evacuation Procedures

4.7.5   Procedures Implemented in the Event of a Major Fire, Explosion, or On-site Health Emergency Crisis

Plan Addendum Acceptance Form - Summary of Activities

Table

Table 2.1   Toxicological Properties of Compounds

 


[1] Parsons, 1995. Health and Safety Plan for Closure of Solid Waste Management Units at Camp Stanley Storage Activity, prepared under Air Mobility Command Contract F11623-94-D0024, Order RL17, prepared by Parsons Engineering Science, Inc., Austin, Texas, December 1995.