[Home] [Master Table of Contents]

[AOC 40 Links]

Area of Concern 40
Chronology of Actions/Investigations

Year

Month

Action/Results

Action performed by

Project Number

1995

May

Geophysical survey was conducted at all the “open” areas within a 2,000-foot radius of well 16, including AOC 40. Found one anomaly that may be caused by an overhead power line or subsurface disturbance.

Parsons ES

Order 67

June-July

Nine soil-gas survey samples collected and analyzed for chlorinated and aromatic volatile organics. PCE was the only target analyte detected.

Parsons ES

Order 67

2000

January

Collected 5surface soil samples (SS1-5) and analyzed for PCE, TCE and DCE.

Parsons ES
O’Brien & Gere

DO5068

2002

May

Final RCRA Facility Investigation Closure Report submitted.

Parsons

NA

August

TCEQ issued approval of site closure.

TCEQ

NA