[Home] [Master Table of Contents]
Area
of Concern 40
Chronology of Actions/Investigations
Year |
Month |
Action/Results |
Action performed by |
Project Number |
1995 |
||||
May |
Geophysical survey was conducted at all the “open” areas within a 2,000-foot radius of well 16, including AOC 40. Found one anomaly that may be caused by an overhead power line or subsurface disturbance. |
Parsons ES |
Order 67 |
|
June-July |
Nine soil-gas survey samples collected and analyzed for chlorinated and aromatic volatile organics. PCE was the only target analyte detected. |
Parsons ES |
Order 67 |
|
2000 |
January |
Collected 5surface soil samples (SS1-5) and analyzed for PCE, TCE and DCE. |
Parsons ES |
DO5068 |
2002 |
May |
Parsons |
NA |
|
August |
TCEQ |