AETC Work Plan Addendum

Area of Concern 39

Soils: Krum Complex, and Trinity and Frio Soils.

Known: The site is located west of Well 16 between the North Outer Road and the cantonment fence, and is approximately 0.5 acres in size.

Previous Investigations (Updated): Under Order 67, a geophysical survey was conducted in May 1995 at all "open" areas within a 2,000-foot radius of Well 16. Two anomalies were found in this area, labeled Well 16 West at the time, and are now included as AOC 39. The anomalies did not appear to be caused by overhead power lines.

In June and July 1995, nine soil gas survey samples were collected and analyzed for chlorinated and aromatic volatile organics. PCE was detected in this area (0.18 ug/L was the highest concentration detected).

Data Needs: Analytical data (VOCs – TCE, PCE, and DCE) for surface and subsurface soils.

Rationale for Analytical Program: Based on the site’s vicinity to well 16 and previous investigations at the site, chemicals of potential concern include VOCs, (PCE, TCE and DCE). Metals, explosives, and SVOCs are not included at this site based on soil gas survey and geophysical survey results.

Closure Activities: The following activities constitute an additional investigation of AOC 39. This work will be completed as part of the requirements under the RCRA 3008(h) Order under AETC delivery order 5068.

bullet

Collect five surface grab samples to a maximum depth of 2 feet to characterize surface soils surrounding the area. The surface samples will be collected from the area and biased toward the anomalies and the soil gas survey points with the highest PCE readings. Figure AOC39-1 depicts the proposed locations for the surface samples. This work is being performed in conjunction with sampling efforts at AOCs 36, 38, and 40. Each sample will be analyzed for VOCs (TCE, PCE, and DCE). QA/QC samples will be collected as described in Section 2.4 of the FSP.

bullet

Handle IDW as specified in the FSP.

bullet

If the results of the above work indicate that the site can be closed under RRS1 without any further investigation and/or remediation, a technical/closure report will be prepared and submitted in accordance with TNRCC closure requirements. If the site does not meet RRS1 requirements, a technical report describing the results of the investigation and recommended additional investigation and/or remediation will be prepared.